Platform Guide

How AsimovGrid Works

Institutional-grade site intelligence for infrastructure investments. Faster deal origination, accurate risk assessment, and data-driven underwriting.

Weeks → Hours

Reduce due diligence timeline from weeks to hours with comprehensive site analysis

Accurate Risk Assessment

Real-time LMP data, regulatory tracking, and infrastructure scoring for collateral assets

Data-Driven Underwriting

Transparent methodology with verifiable data sources for investment decisions

Power Site Marketplace

Discover and analyze 10,000+ power generation sites

Site Discovery

Browse power plants with excess capacity across all major ISOs. Filter by state, fuel type, capacity, and excess capacity score to find sites matching your criteria.

  • EIA Form 860 data for all US power plants
  • Real-time LMP pricing from ISO feeds
  • Excess capacity scoring algorithm
Site Analysis

Each site includes comprehensive analysis: LMP trends, congestion patterns, curtailment analysis, and investment thesis generation.

  • 24-hour and 7-day LMP charts
  • Regulatory approval likelihood score
  • Automated investment thesis

Battery Scavenging Model

Economic curtailment methodology for BESS sizing

The Correct Methodology

We use Economic Curtailment (Eexcess = Ppotential - Gactual) instead of the incorrect Nameplate-based calculation. This measures actual clipped energy available for battery scavenging.

Eexcess = Energy available for battery
Ppotential = HSL/Forecast (what plant COULD produce)
Gactual = Actual dispatched generation

ISO Data Sources

  • ERCOTHSL (High Sustainable Limit) from MIS reports
  • CAISODirect Curtailment MWh from OASIS API
  • PJMWind/Solar Forecast vs Generation delta
  • MISOForecast vs Actual from Real-Time Displays

Land Assessment Tool

Analyze any location for development potential

Data Center Potential

Scores based on power availability, fiber connectivity, water resources, and regulatory environment.

0-100 Score
Power Production

Evaluates solar/wind potential, grid interconnection costs, and LMP market conditions.

0-100 Score
Utility Development

Assesses substation hosting, transmission access, and infrastructure readiness.

0-100 Score

Land Use Validation

The tool automatically detects land use types and flags unsuitable properties (residential, government, institutional) as "Not Suitable" with clear explanations. This prevents wasted analysis on properties that cannot be developed.

Regulatory Approval Score

Data center city council opposition tracking

Based on research of 100+ documented data center city council cases (2022-2026), we calculate approval likelihood for any location considering:

20%
State Risk Level
25%
Proximity to Opposition
30%
Moratorium Status
25%
Grid Infrastructure

High-risk states: VA, CA, PA, GA, MD, OH, IL, AZ. Counties with active moratoriums receive additional penalties.

Collaboration Features

Work with your team on site analysis

Save & Track Sites
  • Save power sites and land assessments to your profile
  • Add private notes and memos to any site
  • Compare multiple sites side-by-side
Team Collaboration
  • Invite team members to view assessments
  • Share assessment links with stakeholders
  • Role-based access (viewer, editor, owner)

Data Sources

Transparent, verifiable data for investment decisions

EIA
Form 860 plant data
ISO APIs
Real-time LMP feeds
Google Maps
Geocoding & Places
NREL ATB
Cost assumptions

Ready to Get Started?

Explore power sites or assess your own land parcels for development potential.